Home Living Doing Business Visiting Contact
Street Department
 

Garrett Luckie, Street Department Employee

Department HeadMilton Luckie
Assistant Allen Powell

The duties of the Street Department encompass a wide variety of jobs which include, but are not limited to the following:

  • Repair sidewalks, driveways and curb and gutter lines that are damaged. Maintaining concrete ditches, drain inlets in the streets and on drainage easements.
  • Repairing potholes, overlaying streets, striping, and milling of streets as necessary.
  • These activities are aimed at maintaining streets in good driving condition.
  • Sweeping the streets on a rotating basis and before and after any special events like the Christmas Parade.
  • Laying of pipe and roadside ditches.
  • Cleaning catch basins and repairing erosion along the stormwater system.
  • Clearing debris from stormwater systems to allow the free flow of storm water.
  • Repairing washouts.
  • Respond to hazardous spills when called by the Police or Fire Department.
  • Removal of unsafe trees on right-of-way.
  • Maintain traffic signals.
  • Maintain/replace stop signs, street name signs, speed limit signs, directional signs.

2109 Luveme Highway
Greenville, AL 36037
Main Contact: 334-382-8271

Copyright © 2017 - City of Greenville, Alabama
119 East Commerce Street, Greenville, AL 36037 | 334-382-2647
Privacy Policy
Website designed and developed by Ingenuity, Inc.